|
Canada-QC-NOUVELLE 公司名录
|
公司新闻:
- Estimation of 11 KV Lines Or HT Line Or High Tension Line
For 11 KV lines, Double pole structure is to be provided for each run of 1 KM with an additional DP structure required for tapping and deviations if any Therefore, No of DP structures = No of KM + (Deviation ) 1 + 1 ( for tapping )
- Annex (B) Technical Specifications for 11kV LV Distribution . . .
This specification covers the provision of tubular steel supports, crossarms, fittings and accessories suitable for 11kV overhead lines with maximum conductor size 120 20 ACSR and LV lines with maximum conductor size 120mm2 AAC It supersedes all previous specifications for 11kV LV distribution overhead line supports that have been issued by MOE
- Types of Electric Poles in Overhead Transmission Lines
Steel towers: In practice, wooden, steel and reinforced concrete poles are used for distribution purposes at low voltages, say up to 11 kV However, for long-distance transmission at higher voltage, steel towers are invariably employed
- TECHNICAL SPECIFICATION FOR LINE ERECTION - OPTCL
All poles on both sides of all the crossings shall be tension poles i e disc type insulators shall be used on these poles At all the crossing described above the contractor shall use protective guarding as per REC Construction Standard A-1 to fulfill statutory requirements for 11 kV 33 KV trunks main spur line
- Copy of BOQ for 11 KVHTInput Power line for Manoharpur . . .
Detailed alignment survey and tree trimming work for erection of 11 KV Overhead line as per the instruction of Engineer -In- Charge
- 11 KV Pole Design As Per REC | PDF - Scribd
The document shows a diagram and specifications for an 11kV overhead power line It includes details of the pole configuration and placement of conductors and earth wire The maximum span between poles is 107 meters
- 068177 Overhead Transmission Line Design Criteria - PG E
transmission line structures into the station need to remain insulated at 60 70 kV, in order to prevent flashing the station bus due to insulator mis-coordination On non−conductive poles, pole hardware needs to be grounded
|
|